Key facts

  • Location

    France, Villy-le-Pelloux
  • Delivery

    December 2008

  • Client

    ADELAC

  • Contractor

    Bouygues Travaux Publics, Bouygues Bâtiment Grand-Ouest, Bouygues Bâtiment Sud-Est, Losinger Marazzi

Design and construction of a mountain motorway

Despite its short length (18.8 kilometres), this 2x2 lane motorway was a highly complex project, presenting both technical and operational challenges.

Its route between Annecy and Geneva passes through steep valleys and mountain ranges, requiring the excavation of a 3.1-kilometre twin-tube tunnel under Mont Sion.

The project also includes four viaducts (including the 360-metre-long Usses viaduct), a 290-metre cut-and-cover tunnel, 25 standard engineering structures, and an interchange with the A40 and A401 at Saint-Julien-en-Genevois.

Un long viaduc moderne traverse une vallée luxuriante aux couleurs automnales, avec des forêts aux teintes orangers et vertes. En arrière-plan, on distingue des montagnes bleutées sous un ciel clair.

Key figures

  • 4,3 M
    m³ of excavated material
  • 800 000
    m³ of blasting
  • 2,2 M
    m³ of fill
  • 150
    earthmoving machines

Sustainable mobility at the heart of Alpine regions

Completing the construction within a particularly tight timeframe of 31 months represented another major challenge for this project. This was achieved through the implementation of four autonomous sub-projects, a trade-based organisational structure, and optimised management of excavated materials.

Environmental measures—including landscape integration, protection of flora and fauna, and 3,000 metres of noise barriers—were also put in place. Now linking Annecy and Geneva in just 30 minutes (compared to 1 hour and 15 minutes previously), this infrastructure greatly improves daily life for the residents of Haute-Savoie and all the communities along the Alpine corridor between Grenoble and Geneva.

Vue d'en dessous de deux structures de pont modernes, avec des poutres sombres dont l'une arbore une bande bleue, soutenues par des piliers en béton gris. Elles enjambent une vallée forestière aux couleurs automnales vives, sous un ciel bleu lumineux.
Skip the slider

Our projects

Do you have a project?
Let's discuss it.

Optional country selection. This information will be sent with your request.
Continue without country selection

Join us!

Hundreds of opportunities available worldwide.
This button will open a new window with the search results