Key facts

  • Location

    Congo - Brazzaville, Watsa
  • Client

    Barrick, Anglogold Ashanti

  • Contractor

    DTP Natural Resources Management

Open-cast mining.

For more than 11 years, DTP has been operating the Kibali mine, one of the largest gold mines in Africa. To date, more than 130 million cubic metres of material have been excavated from eight pits spread over fifteen kilometres.

The company has created an on-site training centre at the Kibali mine to provide the local population with quality education and training on how to perform maintenance operations on mining equipment. Kibali has three hydropower dams that produce 80% of the energy needed to operate the mine.

This facility has given DTP the opportunity to launch a pilot programme on battery-electric trucks in late 2024.

Vue aérienne d'une vaste mine à ciel ouvert montrant des excavations terrassées aux tons bruns et gris, avec un lac turquoise en forme de cœur remplissant l'un des puits profonds. Des routes de terre serpentent entre les zones d'extraction, entourées de verdure luxuriante.

Key figures

  • 13,5M
    m³ extracted per year on average.
Skip the slider

Our projects

Do you have a project?
Let's discuss it.

Optional country selection. This information will be sent with your request.
Continue without country selection

Join us!

Hundreds of opportunities available worldwide.
This button will open a new window with the search results